Experienced QA/QC Engineer with strong expertise and extensive knowledge in oil & gas construction.
Ability to multitask and prioritize the work accordingly to meet all the deadlines.
Familiar with Alloy steel, C.S, LTCS, & M.S, based materials & electrodes.
Good exposure to international codes and standards with knowledge on SMAW, GTAW, GMAW
and FCAW with all positions.
Good knowledge of QUALITY MANAGEMENT SYSTEM (ISO 9001:2011; ISO 9000:2011).
Familiar with ГОСТ Р 54382-2011, DNV-OS-F101-2000 "Submarine pipeline systems"; API 6D, API 6FA; ISO 13623:2009.
Undergone & handled many prestigious projects as well as international projects such as "Achimgaz", "Development Filanovsky oil & gas field" in the Caspian Sea.
Interpretation of procedures, drawings, instructions and specifications for inspections.
Professional Experience in Supervising Piping lay-out and related works more than 5 years.
Excellent interpersonal, presentation and communication skills. (Verbal and Written).
Expertise in Windows, PowerPoint, Word, Notes and Excel.
Excellent skills of issue quality records and quality reports detailing tests and results, nonconformity reports.
As a QA/QC Welding Professional, I am competent in field of Welding Inspections.
Excellent skills of conduct materials testing and analysis, using tools and equipment and applying
technical knowledge necessary to conduct tests.
Deft in handling QC inspections: Incoming inspection, Welding, Piping, Pipeline inspections, inspection of pressure vessels, visual examination and check of dimensions.
Lead QC Engineer 10/2015 till present
Project: Pyakyahinka gas-and-oil field construction. Yamal-Nenets Autonomous Area.
"LUKOIL" LLC Client representative.
Сonstruction units: Comprehensive gas treatment installation, deethanizer and stabilization
Installation, oil treatment unit.
* Check and approve the quality control plans, Project quality procedures in compliance with contractual requirements and ISO Standards and within remit. Detect any design errors, and where possible rectify the same or request the Site Engineer to make the necessary changes.
* Perform quality control inspections during installation of process pipelines. Implement routine piping inspection (e.g. piping material check, piping prefabrication, installation, NDT tests/inspection, Inspection and reporting of the defined tests, certification documentation preparation, etc.). Implement incoming inspection of processing equipment, all base and consumable materials.
* Ensure that all the works on the construction site are conducted in strict compliance with the site HSE requirements, Company's Health and Safety Policy.
* Coordinate all the activities related to welding and installation on the construction site. Check that the Construction schedule is kept to, and to promote action to recover any delay.
* Checked Subcontractors' work progress status sheets and signed the same for approval.
* Ensure that the equipment and manpower employed by the Subcontractor are adequate.
* Supervise the team of Engineers and QC Inspectors working with me. Ensure that inspections and controls are conducted in accordance with the Quality Control Plan and with applicable specifications and codes, and obtaining the relevant documentation.
* Communicate with field staff on construction engineering matters.
* Participate in the Weld Procedure Qualification in accordance with ASME SEC IX.
* Qualify welders as per ASME section IX.
* Witnessing and monitoring Hydro testing, Flushing and Leak testing.
* Issued relevant quality records and various reports such as Daily Reports, Inspection Reports, Non-conformity Reports.
Lead QC Engineer 02/2013 to 10/2015
Project: Filanovskiy gas-and-oil field facilities construction. Caspian Sea, offshore and onshore sections.
Construction objects: offshore and onshore sections; pipe-laying barge "Castoro12", owned by "Saipem"; Offshore ice-resistant fixed platform-1 on Korchagjna oil field, owned by "LUKOIL" LLC; plant for concreting pipe.
* Lead quality control engineer in charge to manage works in quality control and "LUKOIL" LLC Client representative.
* Checked Project quality plan, Project quality procedures in compliance with contractual requirements and ISO Standards.
* Ensured that the works entrusted to the Construction Contractors under my supervision are carried out in strict compliance with the site HSE requirements; quality requirements; technical, financial and schedule requirements of the subcontracts;
* Supervised the team of Engineers and QC Inspectors, manage vendor specialists.
* Ensured that all installation and offshore pipeline laying works were manufacturing in strict accordance with the requirements of DNV-OS-F101-2000; ISO 13623: 2009, the quality control plans, specifications, standards and other regulations, procedures, welding, isolation procedures, approved by the General Contractor.
* Identified and reported to the Project Manager about non-conformities. Prepared the non-conformity register for each Subcontractor and coordinated non-conformity resolution.
* Monitored and audited Construction contractor's Quality Control activities.
* Implemented monitoring of compliance with the terms of the construction behalf of the Client.
* Participated in incoming inspections pipes in accordance with ISO 3183-2012 (10.2.7; 10.2.8).
* Checked calibration of equipment (log & certificates welding & coating).
* Inspected on factory coating (concrete coating).
* Monitored the availability of certification of specialists in General Contractor's NDT laboratory in accordance with the requirements of ASNT SNT-TC-1A.
* Finally signed the Inspection acts and Test records.
QC Engineer 05/2011 to 02/2013
Projects: "Achimgaz", Novyy Urengoy; "TNK-BP-Uvat"; "Bashneft - pole".Trebs and Titov oil field, village Varandey, Nenets Autonomous Area.
* Executed incoming inspection of processing equipment, all base and consumable materials.
* Executed control of correct storage of welding, coating materials.
* Verified certificates of calibration and validity for welding equipment & inspection instruments and instruments used by the Contractor.
*
* Inspected geodetic control network under buildings and structures.
* Witnessed qualifications of piling processes and personal. Performed the construction supervision of the piling.
* Inspected installation of steel structures: installation of caps, pile gratings, beam-and-girder constructions, building frames.
* Witnessed and certificated welding procedures and welder's qualification tests.
* Checked qualification certificates of Contractor's welders and welding specialists.
* Implemented QC procedures as per ISO norms & standards.
* Witnessed Mechanical Tests for Welding Procedure Qualification.
* Performed Welding inspections (steel structures, process pipelines).
* Performed Visual Inspection. Prepare NDT request. Radiographic films review.
* Conducted inspections of welding of Carbon steel, Stainless steel, LTCS, Low alloy steels.
* Performed internal and external inspections on process equipment and tanks.
* Witnessed and monitored Hydro testing, Flushing and Leak testing.
* Identified and reported non-conformances.
* Checked permission and executive contractor's documentation.
Welding Supervisor 06/2010 to 05/2011
Projects: main gas pipeline ; main gas pipeline "Gryazovets - Vyborg", gas-compressor station "Portovaya", main gas pipeline "Sakhalin-Khabarovsk-Vladivostok" main oil pipeline "ESPO-2".
Objects: pig launcher-receiver, pipeline infrastructure of main gas pipeline "Nord Stream", "Gryazovets-Vyborg", processing equipment of gas-compressor station "Portovaya", pipeline infrastructures of main gas pipeline "Sakhalin-Khabarovsk-Vladivostok" and main oil pipeline "ESPO-2".
* Coordinated welding activities for GMAW process using CRC EVANS AW system.
* Organized and implemented installation of steel structures, process pipelines.
* Organized and implemented installation and welding works on the processing equipment of gas-compressor station "Portovaya".
* Coordinated welding activities for processes: SMAW, GTAW.
* Performed visual and dimensional inspection, welding inspections. Radiographic films review.
* Determined the kind of technical tools and equipment needed to do a job properly.
(MRTS)Urengoy, Yamal-Nenets Autonomous Area
Welding Supervisor 11/2009 to 06/2010 Project: Condensate pipe "Zapolyarnoye-Novyy Urengoy" Objects: pig launcher-receiver.
* Coordinated welding activities for processes: SMAW, GTAW.
* Collaborated with engineers and project managers regarding design.
* Organized and implemented installation of steel structures, process pipelines.
* Proposed corrective actions on lay-out, piping and routings.
* Implemented all standard welding safety procedures among the employees.
Aldan, Yakutia
Welding Supervisor 06/2008 to 11/2009 Projects: The main oil pipeline "ESPO-1." Aldan. Yakutia. Objects: The linear pipeline portion of the main oil pipeline.
* Coordinated welding activities for GMAW process using Serimax complex during "ESPO-1" project.
* Coordinated welding activity. Coordinated construction activities on the construction site.
* Implemented visual and dimensional inspection, welding inspections. Radiographic films review.
* Monitored the quality of work performed.
Ozersk (Chelyabinsk Oblast)
Mechanical Engineer in Power Building 04/ to 05/2008
Mechanical Engineer in Repair-construction Workshop 05/1994 to 04/2000
C&I Engineer 10/1986 to 05/1994
* Organized and conducted Overhaul (disassembly, assembly, welding) of heat network pipelines, steam pipelines, water pipelines. Supervised the quality of assembly and welding works.
* Worked in the work permit system. Issued work permit to hazardous work environment.
* Organized and carried out works for running and maintenance of heating systems, water supply, drainage, sewerage, ventilation of production building, as well as technological and repair shop equipment.
* Scheduled preventive maintenance energy systems and workshop equipment, the control over its implementation. Prepared annual orders for spare parts, components and materials in accordance with the preventive maintenance schedule.
* Calculated an amount of necessary maintenance personnel.
* Was in charge of repair crews of hydraulic and optical-mechanical instrument and devices total up to 30 people.
* Organized repair of flow meters reactor group, pressure measurement instruments, devices linear and angular measurements, instrument of time, weighing instruments, testing machines for tensile test.
* Implemented daily monitoring repair quality.
* Control over the presentation of the instruments after repair to the quality inspectors and to the State Verification Laboratory, as well as the timeliness and results verification.
* Preparation of annual orders for spare parts for the repair of measuring instruments.
Moscow Engineering and Physical Institute, Moscow, RussiaMajor in Chemical Production equipment.
NAKS (3 level); Visual and Dimensional Inspection (II level); Radiographic Testing; Ultrasonic Testing (UT); Magnetic Particle Testing (MPT); Construction Compliance Monitoring (technical supervision); Holiday Detection; Industrial safety; Helicopter Underwater Escape Training (OPITO 100/HUET (MEA) Certificate; STCW certificate.
13 июля, 2016
Георгий
Город
Шушенское
Возраст
47 лет (23 февраля 1977)
13 июля, 2016
Павел
Город
Шушенское
Возраст
58 лет (11 сентября 1966)
1 августа, 2016
Алексей
Город
Шушенское
Возраст
45 лет (13 сентября 1979)